    Garage framing.jpg (110515 bytes)

November 18th, gluelam beams in place and floor joists installation started.
Jeremy and Sterling have taken to wearing long pants, summer is now over.

Joists1.jpg (126453 bytes)

Jeremy must have prayed to the wood gods he keeps mumbling "no more concrete, no more concrete".

15 pieces of steel and every screw and weld in the correct spot. Jeremy and Sterling put some wood up b/4 the rains came.

 

November 16th
Steel and Wood, King Crane set in place our steel and wood beams. Thursday the floors start going in. This will make JILL very happy.

from deck.jpg (105304 bytes)

Beam.jpg (116087 bytes)
Crane1.jpg (120166 bytes) Crane2.jpg (110903 bytes)
Steel.jpg (99843 bytes) Steel2.jpg (107702 bytes)
GarageKatie.jpg (104070 bytes)

11/11/99 Garage door framing and my Katie. YESSS a Garage with a bathroom.

BedroomWall.jpg (128703 bytes)

Pony wall for upstairs bedroom.

102299.jpg (184596 bytes) 10/22/99 Garage and lower foundation are in with drains and insulation.

Upper foundation is cut and pier holes (16" round and up to 15" feet deep) are being drilled.

Forms left.jpg (58847 bytes) rebar in wall.jpg (57389 bytes)
Piers and footing poured 9/2/99 Wall forms and rebar 9/3/99
Bathroom plumbing.jpg (118827 bytes)
Garage bathroom plumbing
Steel 4.jpg (128524 bytes) Steel 2.jpg (121061 bytes)

Done Digging August 9th

In goes the steel, 20 feet

Joe-kevin.jpg (101900 bytes) deckout.jpg (105969 bytes)
June 25th Demo Boys Out Comes the Deck
fromnewbackdoor.jpg (122236 bytes) Dirt.jpg (121853 bytes)
Everything to the Dumpster Out Goes theDirt
Blazer in garage.jpg (125827 bytes) side blazer.jpg (115939 bytes)
Finally in my garage 7/13 Did you have to do that